{"id":721,"date":"2006-09-28T01:09:44","date_gmt":"2006-09-28T08:09:44","guid":{"rendered":"tag:www.computerworld.com:\/\/77d915aba2cda0375f6aa1736d168d66"},"modified":"2006-09-28T01:09:44","modified_gmt":"2006-09-28T08:09:44","slug":"offsetting-power-costs-with-power-generation","status":"publish","type":"post","link":"https:\/\/planet.mcb.guru\/?p=721","title":{"rendered":"Offsetting power costs with power generation"},"content":{"rendered":"<p>The average data center uses the equivalent about 2 tons of coal (or 80 barrels of oil) per day; a datacenter with 2,500 servers uses enough electricity in a month to power 420,000 homes a day for a year. A 30,000 square foot data center with 1,000 racks needs $4.2 million a year to power and cool the computing processing power you are using (including maintenance and amortisation costs). <\/p>\n<p>Those figures are from HP, Sun, the Carbon Trust and Forrester Research, and make disturbing reading. <\/p>\n<p>The result the of latter example would also generate 44,000 tonnes of carbon into the atmosphere; in the EU you can offset that using the Emissions Trading Scheme, but it would cost you an additional 700,000 Euros to do so.<\/p>\n<p><a href=\"http:\/\/feeds.computerworld.com\/~a\/Computerworld\/MartinMCBrown?a=7vv2DL\"><img src=\"http:\/\/feeds.computerworld.com\/~a\/Computerworld\/MartinMCBrown?i=7vv2DL\" border=\"0\"><\/img><\/a><\/p><img src=\"http:\/\/feeds.computerworld.com\/~r\/Computerworld\/MartinMCBrown\/~4\/28788364\"\/>","protected":false},"excerpt":{"rendered":"<p>The average data center uses the equivalent about 2 tons of coal (or 80 barrels of oil) per day; a datacenter with 2,500 servers uses enough electricity in a month to power 420,000 homes a day for a year. A 30,000 square foot data center with 1,000 racks needs $4.2 million a year to power and cool the computing processing power you are using (including maintenance and amortisation costs). <\/p>\n<p>Those figures are from HP, Sun, the Carbon Trust and Forrester Research, and make disturbing reading. <\/p>\n<p>The result the of latter example would also generate 44,000 tonnes of carbon into the atmosphere; in the EU you can offset that using the Emissions Trading Scheme, but it would cost you an additional 700,000 Euros to do so.<\/p>\n<p><a href=\"http:\/\/feeds.computerworld.com\/~a\/Computerworld\/MartinMCBrown?a=7vv2DL\"><img decoding=\"async\" src=\"http:\/\/feeds.computerworld.com\/~a\/Computerworld\/MartinMCBrown?i=7vv2DL\" border=\"0\"><\/img><\/a><\/p>\n<p><img decoding=\"async\" src=\"http:\/\/feeds.computerworld.com\/~r\/Computerworld\/MartinMCBrown\/~4\/28788364\"\/><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[27],"_links":{"self":[{"href":"https:\/\/planet.mcb.guru\/index.php?rest_route=\/wp\/v2\/posts\/721"}],"collection":[{"href":"https:\/\/planet.mcb.guru\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/planet.mcb.guru\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/planet.mcb.guru\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/planet.mcb.guru\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=721"}],"version-history":[{"count":0,"href":"https:\/\/planet.mcb.guru\/index.php?rest_route=\/wp\/v2\/posts\/721\/revisions"}],"wp:attachment":[{"href":"https:\/\/planet.mcb.guru\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/planet.mcb.guru\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/planet.mcb.guru\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}